Welding and Laying of 10km 36” Pipeline

Pipeline integrity begins with precision welding and expert installation. BoratGlobal successfully executed the welding and laying of a 10km, 36-inch pipeline for Arthur Ferdinand Limited — a major infrastructure project that enhanced product transportation capacity and operational efficiency.


Challenges


Executing large-diameter pipeline projects requires specialized coordination between welding, laying, and testing teams. The 10km stretch presented geographical and logistical challenges, uneven terrain, high heat conditions, and strict deadlines.

Ensuring weld quality and alignment across the entire pipeline length while maintaining safety standards demanded careful planning and expertise.

Case Image
Case Image

Solution


BoratGlobal mobilized a skilled welding and construction crew equipped with state-of-the-art automatic and semi-automatic welding machines. Each weld was performed under controlled parameters and subjected to non-destructive testing (NDT) to ensure structural integrity and compliance with API 1104 standards.

Simultaneously, the laying team implemented precision alignment and trenching procedures to maintain depth consistency and minimize stress points. Post-welding, the entire pipeline underwent hydrostatic testing and quality verification before commissioning.

The project was delivered efficiently and safely, demonstrating BoratGlobal’s technical capability and commitment to world-class pipeline infrastructure execution.